Hull

Comprehensive Mechanical and Electrical Installation Services

We provide comprehensive mechanical and electrical installation services to commercial, industrial and public sector clients in the East Yorkshire region.

We have completed new and refurbishment projects on almost all building types, and also offers speciality building risk management systems such as controlled access, CCTV, and fire alarms.

Our dedicated engineering staff offer a total package backed by professional indemnity insurance for complete peace of mind.  This, coupled with our highly skilled resources across a range of disciplines including mechanical, electrical, communications and security control, ensures we can offer a comprehensive solution to the needs of clients, architects, consulting engineers and building contractors.

Some of our clients…

Comments from our clients…

Staff House Phase 1 – University of Hull

I would be happy to work with Vallectric in the future.

Geoff Smith
Sewell

Trinity House School Academy

The supervisor did an excellent job and contributed significantly to the overall success of the scheme. The engineer performed to the highest of standards.

John Gledhill
Houlton

County Hall, Hull

The feedback from the end user was that the engineer who carried out the work was very professional and the installation was to a high standard.

Phillip Wilson
ERYC

Southcliffe Caravan Park, Bridlington

Generally very good, friendly and pro active.

Mark Harton
ERYC

Larkin Lecture Theatre Rufurbishment, Hull

Paul and Chris did an outstanding job and worked really hard to make sure that we meet the handover date, I could not of asked for a better management team.

Gareth Copnell
Houlton

Case Building, Hull

The main engineer on site and was very helpful and had a good understanding of all works carried out, would highly recommend him for any future work. The whole management team where very helpful which created a good working environment.

Steve Cheesman
Houlton

Huddersfield Fire Station

This is our first project with Vallectric and hope it is the first of many.

Rob Whetham
WYF&RA

Cavendish House, Chesterfield

Very pleased with the service and look forward to working with you again.

Guy Fullwood
R.H.Fullwood & Co Ltd

Larkin Lecture Theatre Rufurbishment, Hull

Brilliant set of men on site who are a credit to the company performed great and meet all the deadlines couldn’t of asked for a better team.

Gareth Copnell
Houlton

University House, Hull

Team worked well on site, supervisor worked closely with site manager.

Andy Johnson
Houlton

Marshlands Childrens’ Centre

Fast and effective in getting sub-contractor’s to return to defects.

Paul Drewery
ERYC

Cavendish House, Chesterfield.

Extremely please with the level of service. In particular, the engineers was always very helpful, accommodating and responded promptly.

Guy Fullwood
R.H.Fullwood & Co Ltd

DST Leconfield

The team worked extremely well and integrated well with my own on site staff. There were minor H&S infractions to begin with but very soon both teams understood and adhered to what was required as a bare minimum on site.

Wil Wilson
Carillion

Milestone Farm, Everthorpe

I prefer Vallectric (Hull) to any other contractor and my opinion hasn’t altered on this job.

Dave Padden
Houlton

Middleton On Wolds School

Whenever problems have arose on site a phone call to the engineer and he has always responded very quickly and dealt with the problem.

Paul Fielder
George Hurst

Middleton On Wolds School

I have always found the men that are sent to site are very polite and friendly and always willing to offer good and trusted advice. The work that they do is clean and tidy and always to a high standard, very little snagging.

Paul Fielder
George Hurst

Flemingate

The whole project has been well run with high levels of commitment to get the job done. Well done guys.

Peter Gleave
Willmott Dixon

Middleton Hall, University of Hull

Thanks to you and all your colleagues for helping deliver a scheme that our client has described as fantastic and has a lot of people at the university very excited.

Trevor Dowling
Westray Keith & Phelps

Middleton On Wolds School

I personally am very happy with the service that you provide and consider Vallectric one of our better subcontractors. I also look forward to working with you more in the future. Thank you very much.

Paul Fielder
George Hurst

Mariners Court, Beverley

Very pleased with overall approach and also cooperation on and of site.

Guy Fullwood
R.H.Fullwood & Co Ltd

Schoolgirl Mums Unit

Great site team, great communication between all members of vallectric. On programme & to a quality standard. Contact Manager also easy to communicate with, made regular visits to site and was exceptional in the deliverence of this project.

Ashley Banks
Houlton

The Hull Team…

Sales & Enquiries

Mark Louth

Regional Estimating Manager

Responsible for a team of Mechanical and Electrical Estimating Engineers, overseeing development and quality and tender negotiation.

Ashley Munroe

Business Development & Specialist Services

Chris Blackburn

Mechanical Estimator
Steve Grundy performed to the highest of standards. John Gledhill - Houlton (re: Trinity House School Academy)
Engineering

Paul Holroyd

Senior Contracts Engineer
Paul Holroyd was very good to work with throughout the project delivering of his promises.Geoff Smith - Sewell Group (re: Staff House)
Health & Safety

Mark Foster

H&S Co-ordinator

Responsibility for all company Health & Safety policy and procedure, as well as surveying duties for our London Business Centre.

Surveying

Jonathan Hyde

Senior Surveyor
Buying

Guljit Flora

Buyer

Purchaser of standard materials for projects for all the company and arrangement of fleet leases/repairs.

Drawings & Manuals

Tara Langton

Divisional Administrator

Prepares as-fitted drawings and manuals for building services projects.

How to contact us…

Vallectric Limited
Unit 2,
The Shine Knowledge & Innovation Park
St. Mark Street,
Hull,
HU8 7FB

Phone 01482 324 521

Email   hull@vallectric.co.uk

How to find us…

Click to open a larger map

Some of our projects…

Commercial and Industrial Buildings
Dry Dock – Block B2 & C - Hull
Vallectric were employed by Hobson & Porter to carry out the electrical services to two new high tech office buildings based in the Fruit Market area of Hull.
The works consisted of mains distribution equipment, lighting, emergency lighting, intruder alarm, power and fire alarm installation.
Client Wykeland Developments
Main Contractor Hobson & Porter
Approx value £250k
Duration of the works April 2016 to August 2016
C4DI Office Block - Hull
c4di Vallectric were employed by Hall Construction to carry out the electrical services to a new high tech office building based in the Fruit Market area of Hull.
The works consisted of mains distribution equipment, lighting, emergency lighting, exterior/amenity lighting, power and fire alarm installation.
Client Wykeland Deveopments
Main Contractor Hall Construction
Approx value £250k
Duration of the works May 2015 to November 2015
New Blender Satellite Centre – Phillips 66
phillips 66 Vallectric were employed by Houlton to carry out the design and electrical installation works to a new blast proof office building based within the Phillips 66 oil refinery.
The works consisted of new main and sub main distribution equipment, lighting, emergency lighting, exterior/amenity lighting, power, fire alarm, CCTV, access control, vehicle access and IT/data installations.
The new Blender Satellite Centre is located directly adjacent to the existing refinery storage tanks and constructed to high safety standards including blast-proofing, in the event of any explosion and air-tight in the event of any gas release.
All aspects of the Client’s operations, the operations and activities of the existing refinery site and every aspect of the new development project were governed by the strictest standards of health and safety.
Client Phillips 66
Main Contractor Houlton
Approx value £250k
Duration of the works October 2013 – March 2014
Retail & Leisure
Flemingate Retail Development, Beverley
Flemingate Vallectric were appointed by Willmott Dixon to provide the mechanical and electrical services to the new Flemingate retail park in Beverley. The works included an 80 bed Premier Inn, a multi storey car park, a multi-screen cinema and retail outlets.
The scope of works included the full M&E installation to the Premier Inn, car park and landlord services to the retail units, including lighting, precinct lighting, fire alarms and smoke ventilation system to the multi story car park car park.
Client Wykeland
Main Contractor Willmott Dixon
Approx value £2.3m
Duration of the works February 2015 – November 2015
Public Authority Buildings
Staff House Phase 2 refurbishment – University of Hull
Vallectric were appointed by Geo. Houlton to carry out the electrical and mechanical installation to the Staff House building (renamed as the Canham Turner Building) at the University of Hull. The building is a major venue for the University and includes function suites of various sizes, conference rooms, offices, bars, exterior seating areas and a new refectory area. Vallectric supplied and installed new mains distribution equipment, lighting, emergency lighting, fire alarm, IT/data, power, systems, heating, domestic hot and cold water, ventilation and air conditioning systems to all areas.
Client University of Hull
Main Contractor Houlton
Approx value £1.1m
Duration of the works October 2016 to June 2017
Labs 008 & 009 – Chemistry Building – University of Hull
Vallectric were appointed by Sewell Construction to carry out the electrical and mechanical installations to labs 008 & 009 within the chemistry building at the University of Hull. Vallectric supplied and installed new mains distribution, including shut downs within the “live” building to install a new switch gear, lighting, emergency lighting, fire alarm, IT/data, power, heating, domestic hot and cold water, ventilation, air conditioning systems, medical gas installations and fume cupboards. The works to the labs were carried out in an occupied building with disruption to the users kept to an absolute minimum due to our planning and discussions with the client.
Client University of Hull
Main Contractor Sewell Construction
Approx value £250k
Duration of the works January 2017 to July 2017
Staff House Phase 1 refurbishment – University of Hull
Vallectric were appointed by Sewell Construction to carry out the electrical and mechanical installation to the Staff House main kitchen at the University of Hull. Vallectric supplied and installed new mains distribution, which included a complex shut down to install a new main switch panel, lighting, emergency lighting, fire alarm, IT/data, power, access control systems, heating, domestic hot and cold water, ventilation and air conditioning systems.
Client University of Hull
Main Contractor Sewell Construction
Approx value £250k
Duration of the works July 2016 to October 2016
Middleton Hall Refurbishment – University of Hull
Vallectric were appointed by Houlton to carry out the electrical and mechanical installation to the extended and refurbished Middleton Hall theatre at the University of Hull. Vallectric supplied and installed new mains distribution, lighting, emergency lighting, fire alarm, IT/data, power, access control systems, heating, domestic hot and cold water, ventilation and air conditioning system. All installations were carried out to an outstanding standard. The building is to play a major role for Hull during the 2017 City of Culture celebrations.
Client University of Hull
Main Contractor Houlton
Approx value £1m
Duration of the works November 2015 to October 2016
A&E Refurbishment Hull Royal Infirmary
Hull Royal Vallectric were appointed by Houlton to carry out the electrical installation to the extended and refurbished A&E department at Hull Royal Infirmary. Vallectric supplied and installed new mains distribution, lighting, emergency lighting, fire alarm, IT/data, power, nurse call, IPS equipment, UPS equipment and access control systems. Out of hours working was also required to connect the new systems into the existing hospitals systems.
The works were carried out at the heart of a fully operational hospital with many interfaces and connections required to the hospitals existing systems. These were carefully planned with the hospital and carried out during weekends, late at night or early mornings to ensure that the normal hospital operations were not disrupted.
Client Hull Hospitals
Main Contractor Houlton
Approx value £800k
Duration of the works June 2014 to November 2015
New Control Room & Data Centre – Humberside Fire & Rescue HQ
HRFR Vallectric were appointed by Hall Construction to provide the electrical services to the new control room and data centre at the Humberside Fire and Rescue Headquarters in Hull. The work comprised of the removal of the redundant services. Vallectric supplied and installed a new standby generator, mains distribution, new lighting, emergency lighting, fire alarms, gas suppression systems, power, IT/data and access control systems.
The works included the temporary relocation of the existing control room whilst the works were carried out within the building and the seamless changeover from the temporary facilities to the new centre on completion, all carried out without causing any disruption to the day to day operations of the headquarters. This was only achieved with careful planning and consultation with the client and completing change over works within tight schedules.
Client Humberside Fire & Rescue Services
Main Contractor Hall Construction
Approx value £250k
Duration of the works February 2013 to September 2013
Waste Transfer Depot - Goole
Vallectric were appointed by PBS construction to install the mechanical and electrical services to the new waste transfer depot in Goole. Vallectric supplied and installed new mains distribution, lighting, emergency lighting, fire alarms, mist suppression systems, IT/data, ventilation, heating, hot & cold water services and sanitary ware on the project.
Client East Riding of Yorkshire Council
Main Contractor PBS Construction
Approx value £200k
Duration of the works August 2013 to November 2013
Universities, Colleges & Schools
Mountbatten School, Hull
Vallectric were appointed as principle contractor by Hull City Council to carry out the replacement of the existing lighting installations and upgrade of the heat emitters at Mountbatten School in Hull.
The works included the installation of new energy efficient LED light fittings to replace the existing fluorescent fittings, amending the cabling and switching arrangement to suit the new lighting layout, the installation of new heat emitters, steel pipework and all associated builders work, boxing in, patching and painting. The works were carried out during the school’s summer break and were completed on time and on budget.
Client Hull City Council
Approx value £150k
Duration of the work July 2017 to August 2017
East Riding College, Beverley
East Riding College Vallectric were appointed as a sub-contractor by Houlton’s to carry out the electrical design and installations to a new build College for East Riding College.
The installation which formed part of the Flemingate development in Beverley included full electrical design and services to the college including the main & sub main distribution, lighting, emergency lighting, fire alarm, emergency call systems, PV system, a wind turbine access control, intruder alarm, data services & CCTV. The works were completed on time and on budget for the new college intake in August.
Client East Riding College
Main Contractor George Houlton
Approx value £1.2m
Duration of the works November 2014 to August 2015
New Trinity School, Hull
New Trinity School Vallectric were appointed as a sub-contractor by Houlton to carry out the electrical installations to the New Trinity House School in Hull.
The installation to this prestigious city centre project included full electrical services to the refurbished main school building which was formally the Derek Crothall building and a new build sports hall. Works included new main & sub main distribution, lighting, emergency lighting, fire alarm, emergency call systems, access control, intruder alarm, refuge alarm and data services. The works were carried out to a very high standard despite a tight contract programme and were completed on time and on budget.
Client Hull City Council
Approx value £800k
Duration of the works September 2012 to August 2013
Towngate School, Ossett
Towngate Vallectric were employed by Hobson & Porter to carry out the M&E services to a new build extension at Towngate School in Ossett.
The systems installed included lighting (including emergency and external lighting), general power, fire alarms, access control, CCTV, plumbing, heating, sanitary ware underfloor heating, ventilation above ground drainage and emergency call systems. The day to day activities of the school were not interrupted during the works despite the installation of new mains distribution equipment within the existing building and the installation of a new site wide fire alarm system.
Client Wakefield MDC
Main Contractor Hobson & Porter
Approx value £200k
Duration of the work May 2014 to August 2014
Private/Public Sector Housing
22 Apartments, Wesley Court, Withernsea
Vallectric were appointed by Hall Construction to design and install the electrical services to 22 new build apartments in Withernsea for East Riding of Yorkshire Council. The systems installed included mains distribution, lighting, power, fire alarms, access control, TV aerial systems and external lighting.
Client East Riding of Yorkshire Council
Main Contractor Hall Construction
Approx value £100k
Duration of the works July 2016 to October 2016
32 Apartments, East Park Road, Leeds
Vallectric were appointed by Houlton to design and install the electrical and plumbing services to 32 new build apartments in Leeds for Leeds City Council. The systems installed included lighting power, access control, TV aerial systems, gas fired central heating systems, hot and cold water services, whole house ventilation and sanitary ware.
Client Leeds City Council
Main Contractor Houlton
Approx value £350k
Duration of the works November 2015 to April 2016
The Orchard Homeless Shelter, Hull
Orchard Vallectric were appointed by Hobson & Porter to install the electrical services to a new 30 bed homeless person facility at The Orchard in Hull. The systems installed included lighting (including emergency and external lighting), general power, fire alarms, access control, CCTV, and emergency call systems. The facilities within the accommodation included a laundry, student common room, management suite and car park. A separate industrial unit also formed part of the scheme to enable the residents to train in the repair of household furniture for sale within the client’s charity shop.
Client Emmaus
Main Contractor Hobson & Porter
Approx value £200k
Duration of the works February 2015 to October 2015
15 New Build Bungalows – Larne & Weaver Road - Hull
15 Bungalows Vallectric were appointed by Hobson & Porter to install the electrical and plumbing services to 15 new build bungalows in Hull. The systems installed included lighting power, gas fired heating systems, hot and cold water services, ventilation and sanitary ware.
Client Pickering & Ferens Housing Association
Main Contractor Hobson & Porter
Approx value £150k
Duration of the works September 2014 to February 2015
33 New Build Houses - Doncaster
33 New Build Houses Doncaster Vallectric were appointed by Houlton to design and install the electrical services to 33 new build houses in Doncaster. The systems installed included lighting, power, PV systems and TV aerial & satellite systems. The properties were spread over 3 separate sites across Doncaster and were constructed to Code for Sustainable Homes ‘Code Level 3’.
Client Doncaster MBC
Main Contractor Houlton
Approx value £150k
Duration of the works March 2014 – November 2014